AS EASY AS IT GETS.AS EASY AS IT GETS.AS EASY AS IT GETS.
Get the big picture. Analiza el proyecto a grandes rasgos. Ayez une vue d’ensemble.Read these installation instructions. Check to see you have all th
Decide where to locate the top of the vertical panel. Mark a hang line for the track 8.5" down from the top of the vertical panel.Decide dónde ub
Position track slightly past outside panels. Make sure bottom of track lines up with hang line and screw into the stud that's nearest to the cent
Rotate track out of position, then drill toggle holes. Use 1⁄2" drill bit.Gira el riel hacia afuera, luego perfora los orificios para los vástagos
#8 x 2" screw#6 x 1/2" zinc screwsToggle boltMeasure remaining track and cut if necessary. Repeat steps 4–9. Cut track to correct length wit
Cut rods to correct length with a hacksaw, if necessary.Corta las varillas al largo correcto con una sierra para metales, si es necesario.Au besoin, c
Congratulations! Your installation is complete.¡Felicitaciones! Haz finalizado la instalación.Félicitations! Vous avez terminé l’installation.1514The S
Commentaires sur ces manuels